RUNNING A PROJECT
Visit to SENT Landfill Construction Site
Time: 17 April 2019 ‐ 1.30pm
Participants: HKU MLA2 Students
Purpose of Visit
The purpose of our visit is to acquire on-site experience of the role a Landscape Architect can play on site in the administration of a construction contract. We will be looking at both an overall ‘supervision issues’ as well as some of the day-to-day supervision tasks that would be undertaken by resident site staff, and to engage in design contract administration processes.
You should pay particular attention to how the site staff establish acceptable standard of materials and workmanship, identifying defects, and dealing with design changes.
Site information:
Location: Tai Chik Sha, Tseung Kwan O
Area: 100 ha
Max. height of filling: 135 mPD
Max. depth of waste: 100 m
Capacity: 43 Mm³
Current waste intake: about 2,500 tonnes per day (2016)
Waste types: Starting from 6 January 2016, the SENT Landfill will only receive construction waste.
Operation hours: 08:00- 22:00 (daily throughout the year)
Aftercare period: 30 years after completion of operation
Contractual Arrangement
Contract type: Design, construction, operation, restoration and aftercare to be carried out by the Contractor to the specified performance criteria
Client: Environmental Protection Department
Contractor: Green Valley Landfill Ltd.
Consultant Design Landscape Architect: Urbis ltd
Independent Checker (IC): Meinhardt Infrastructure and Environment Ltd
IC Consultant Landscape Architect: Barry Wilson Project Initiatives Ltd
Contractor Facility Office Tel: 2706 8800
Commencement of construction: September 1993
Commencement of operation: September 1994
Financial Details
Capital cost: $2,200 million
Operation cost: $191 million/year