top of page
HKU MLA
Landscape Practice 2019

1) PROJECT TYPE

 

    - Master planning & Urban design

    - Parks & open spaces design

    - Urpan spaces design  

    - Hotel & lesiure

    - Residential

    - Commerical & mixed use

    - Health care

    - Government & institutional

    - Environment assessment

    - Infrastructure

    - Research

    - Golf

    - Tree consultancy services

    - Urban design parameters

    - Infrastructure and land supply studies

    - Railway and rail-related

    - Property development

    - Statutory planning

 

2) PROJECT STAGES

 

    - Stage 1 - Concept Design

    - Stage 2 - Design Developnment

    - Stage 3 - Tender Documentation

    - Stage 4 - Tender

    - Stage 5 - Construction Inspection

 

3) COMPANY STRUCTURE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4) HOW THE PROJECT RUN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5) QUALITY CONTROL

 

  - It represents the minimum requirements for plan implementation. The Design Consultant’s corporate officer responsible for quality merges these guidelines with corporate Quality Assurance/Quality Control requirements. The Design Consultant is responsible for the overall quality of the final design product and is required to incorporate the review of all sub-consultants work into the project-specific Designer Quality Control plan. A well‐structured Designer Quality Control Plan helps to ensure that designs are economical, constructible, maintainable and appropriate for their locations and surroundings. 

 

6)PROJECT QUALITY PLANS

   

 - Urbis client

    - Project client

    - Sub-consulatants

    - Urbis organisation

             - Project director, name n responsibility  

             - Project manager, name, responsibility

             - Project Landscape designer, name, responsibility

             - Graphics Manager, name, responsibility

    - Scope of Service

    - Deliverables

    - Programme and key dates

    - Details of project brief review

    - List of task-specific practice notes

    - List of relevant statutory, regulatory and ordinances, and technical requirements 

    - Approved software

    - Signed by PD & PM

PEER ASSESSMENT

How would our classmate rate our performance ?

For the platform set-up, Group 7

Clearness of Format  & User-friendliness :  4.3 /5

Creativity :  3.6 /5

Rating :  7.5 /10

Details of Comments:

 

 

COMPANY STRUCTURE.jpg
Hoe the project run.jpg

 © 2019 by HKU MLA2 Landscape Practice Class. Proudly created with Wix.com

  • Grey Facebook Icon
  • Grey Instagram Icon
  • Grey Vimeo Icon
bottom of page